Multi-Site Rollout Readiness Checklist

Use this checklist to prepare site lists, equipment, access, testing, and handoff before a multi-site installation.

Build your site list

Record each site’s address, local contact, hours, access rules, and target installation date. Flag any sites that need a survey before scheduling.

Run a pilot

Choose a representative site and confirm the equipment, mounting locations, network handoff, and acceptance tests. Record exceptions before releasing the remaining sites.

Schedule and close out each wave

Group sites by readiness and region. Assign a contact for access and escalation, and require the same test results and completion records at every site.

Explore nationwide rollout services

Get a Fast Estimate